Service Hotline: 18652225078 0516-83055196

Construction hoist's Lubrication

Release time: 2021-08-25 Visited: 181

  Lubricate all following lubricate spots before the new installed hoist is operated.Lubrication interval is as following diagram when hoist is operated normally.Shorten the interval if necessary.Clean the parts and then oil them.

升降机润滑表.png